Q1.Which of the Following will Take Least Time in Starting From Cold Condition to Full Load Operation-
Gas Turbine Plant.
Nuclear Power Plant.
Hydro Electric Power Plant.
D. Thermal Power Plant.
Correct Option :3
Q2.The Essential Requirement(s) for Power Plants to be Operated as Peak Load Plants are
Low Capital Cost.
CaPability of Quick Starts.
Quick Response to Load Variation.
All of the Above.
Correct Option :1
Q3.Gas Turbine Power Plants for Maximum Efficient May Have
Reheating
Heat Exchangers.
Multistage Compression.
All of above
Correct Option :4