on company letter pad
REF NO-------------- DATE-------
TEST REPORT
CUSTOMER :
ORDER REFERENCE :
PRODUCT :
PANEL SR. NO------------ DRAWING NO. ---------------- QUANTITY ----- ----
SYPPLY VOLTAGE ………………. CONTROL VOLTAGE ……………… AMPERE ------------
The following routine test and inspection were carried out on the above control panel.
GENERAL INSPECTION
1. Verification of bill of material and rating of components ---------------------------------
(As per drawing no……………………………………..
2. Overall &Mounting of dimension of panel -------------------------------
(As per drawing no……………………………………..
3. Power wiring and control wiring of components ---------------------------------
(As per drawing no……………………………………..
4. Paint finish and overall appearance --------------------------------
(Inside ……………………………outside……………………..
ELECTRICAL OPERATION AND TEST
1. Verification of control transformer ------------------------------------
2. Verification of proper function of all components ---------------------------------
3. Verification of correct sequence of operation ----------------------------------
DI-ELECTRIC TEST
1. High voltage test conducted at -------KV Voltage for 1 minute seconds
2. Between each pole and earth ---------------------
3. Between the poles when contacts are open ---------------------
INSULATION RESISTANCE TEST
1. Measurement of insulation resistance with 500/1000V DC Megger Mega –ohm
2. Between each pole and earth ---------------------
3. Between the poles when contacts are open ---------------------
Client’s Rep………………………….. Reviewed by …………………. Tested by ………………
For Pooja Electricals & Engineering works
Download PDF